Issue: 

How to split consecutive balloons into independent ones in ZWCAD MFG?

Solution:

  1. Select the part of the consecutive balloons need to be separated, right-click, and choose Detach from the context menu. 

     

  2. The selected part becomes independent of the remaining balloons.
    Then move the separated balloon as needed.
  3. Select the separated balloon, right-click, and then choose Add Leader from the context menu.

  4. Left-click at the position where the leader is needed and select the object to create the leader.
    Then click the grip point of the separated balloon to specify the second point of the leader.


★How to split merged balloons in ZWCAD MFGhttps://confluence.zwcad.com/pages/viewpage.action?pageId=319946790