Issue:
How do we associate data from BOM in other drawings with the drawing frame of ZWCAD MFG?
Solution:
- Open the original drawing and insert the ZWCAD MFG drawing which has been configured.
- Add new balloons(do not add balloon details).
- Generate a part list and double-click on the table head to enter the Bom Data Edit dialog box.
- Click on Resource → Extract tabular data.
- Input W in the command bar, select the range of the associated past list that need to be added, check if the extraction configuration is correct, click on OK.
- Check the detailed information of Bom Data Edit dialog box, then save the configurations setting to complete the BOM association.
| CN Solution | ★中望CAD机械版如何提取明细表数据并关联到序号 |
|---|
★ How to extract BOM data and associate it with balloons in ZWCAD MFG:https://confluence.zwcad.com/pages/viewpage.action?pageId=177486021






